Safety, Cost Overrun, Delay, Survey

Time, safety and economy constitute the three main factors in a construction project, of which time plays a significant role in construction. Delay in any task or operation is a time overrun which influences the completion of the work. A cost overrun, also known as a cost increase, underrated or budget overrun, involves unexpected costs incurred in excess of budgeted amounts due to an underestimation of the actual cost during budgeting. Accident don’t just happen, they are caused by unsafe acts, unsafe conditions or both. Most accidents result from a combination of contributing causes and one or more unsafe acts and unsafe condition. This study was based on a list of construction problems, causes retrieved from literature reviews. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire was distributed to construction experts who represent owners, consultants, and contractor’s organizations. A case study was analyzed and compared with the most important problems causes in the research. Recommendations was made in order to reduce the problems in constructions.
    [1] Huang, x. And hinze, j. (2003) analysis of construction worker fall accidents. Journal of construction engineering and management, asce, pp. 262-271 [2] Toole, t. M. (2002) construction site safety roles. Journal of construction engineering and management, asce, 12(3), pp.203-210. [3] Sanvito, p., caron, f. And valentini, s., 2004. “Time impact analysis in engineering&contracting projects: an industrial case”, spanish project engineering association, aeipro, the viii international congress on project engineering. [4] Nasrin parsian, april 2009. Developing and validating a questionnaire to measure spirituality: a psychometric process, global journal of health science, vol 1, [5] Ali, A.S., Kamaruzzaman, S.N. (2010), “Cost Performance for Building Construction Projects in Klang Valley”, Journal of Building Performance, Vol. 1, No. 1, 110-110. [6] Doloi, Hemanta. (2012), “Cost overruns and failure in project management - understanding the roles of key stakeholders in construction projects”, Journal of Construction Engineering and Management, Www.ascelibrary.org, doi: 10.1061/(ASCE)CO.1943- 7862.0000621.
Paper ID: GRDJEV02I060060
Published in: Volume : 2, Issue : 6
Publication Date: 2017-06-01
Page(s): 104 - 109